| V2 | Preparation for slab casting |
| 2.1 | Masonry height is matching design data (Masonry level = design level - 10cm) MF4-M40 §2 |
| 2.2 | Masonry width and length is matching calculated DB inside dimensions (L & W) MF4-M40 §2 |
| 2.3 | Inlet installed at least 5 cm clerance with the edge of masory MF4-M40 §2 |
| 2.4 | Inlet diameter is matching the sketchmap |
| 2.5 | Outlets as per sketchmap, at least 15 cm clerance with edge of masory MF4-M40 §2 |
| 2.6 | Outlets diameters are matching the sketchmap |
| 2.7 | Outlets air vents are correctly installed (Tee + elbow 20cm apart) MF4-M40 §2 |
| 2.8 | Overflow is installed, end of PVC coupling are precisely located 10cm above masonry top MF4-M40 §2 |
| 2.9 | All pipes are protected from foreign entrance with plastic bag attached by wire MF4-M40 §2 |
| 2.10 | Rebar mesh (20x20cm ⌀8mm) installed around masonry (7-8cm clearance from it) and at bottom slab level MF4-M40 §3 |
| 2.11 | Contractor knows wall & slabs thickness (15cm) and standards for metal door MF4-M15 §3 & concrete (1:2:3) handling MF4-M13 |