For all structures, foundation excavations are 30cm deep minimum and then compacted well (except for DBs 60cm). For rocky ground (difficult to dig) the drop stone check can be done before 30cm depth to avoid difficult and unnecessary digging. For width, length or diameter it is dimension of the slab + 25cm all around to ease the masonry work, + 50cm for reservoirs. Here under in grey are slabs and in brown excavation:
Compaction control: Drop stone check
Dropping rectangular cut stone from 1m height (waist level) and measuring the mark it leaves on the foundation (1cm deep max.)
Foundations must be done with a 25cm thick and 40cm high masonry wall in periphery and fill with hard core rocks 40cm high in the middle (except DB see MF4-M40). Then a 2cm thick 1:3:6 lean concrete must be casted:
For WP, Wash table and cattle trough outside dimension of the masonry wall are the same as the slab (see chart above).
2cm thick lean concrete
Hard core rocks filling
Masonry wall
For reservoir, outside diameter of the masonry wall is the same as the slab + 0.5m
Masonry wall Hard core rocks filling 2cm thick lean concrete
Reservoir foundation digging: Wash table masonry foundation work on going:
All structures might need a washout (Water points, spring box, reservoirs, cattle trough, DBs), and it should be protected by a concrete structures. Here are the main characteristics that should be respected to build this structure, first the foundation:
Then the structure itself:
Distribution boxes, reservoirs and spring boxes needs metal doors. The section below is summarizing all the technical requirements to be respected during the installation of a metal door.
Inside door dimension is 50x50cm for springs and reservoir (40x40cm for DBs) and must be checked before installation. Under the door, steel flat must be present to be casted in the concrete (for the strength of the structure).

Doors must be at least 2cm higher than the top slab where it is installed. A concrete joint must also be casted inside the door, this 2 items are used to avoid rain infiltration and/or damages.
A concrete ledge must be casted at the same time that the slab. The ledge should be 15cm high, 10 cm wide and 20cm long minimum. When the door is open, the ledge must fully support the weight of the door (5cm from the door to the ledge to let space for door opening).

In order to ensure that the connection will resist to pressure, it is necessary to soften the PVC pipe with glue (in a determine place) in order to allow the teeth of the white ring to bite effectively in the pipe. The process is as follow:
>
>
>
>